FIFA Goal 2, Phase 2 Project

​

Dominica Football Association

East Stand at the Stockfarm Traning Center

PENDEC was responsible for the project management which included:

  • Architectural, Structural and Civil Engineering Design

  • Construction cost estimate

  • Construction Supervision

​

The training center East stand covered 10,400 sq ft. a seating capacity of approximately 1,200 spectators.

 

​

FIFA
Dominica Coconut Products Farm Tank Walls
​
Retrofitting of containment walls for tank farms

PENDEC was selected to provide the following:

​

  • Structural design of Containment walls and pavement for three (3) tank farms on the premises.

  • Construction cost estimate for the project

  • Preparation of tender documents and tender evaluation 

  • Construction supervision

​

We performed structural analysis designs to comply with local and international standards to ensure the sustainability and durability of the containment walls.

​

​

DCP